
On October 6, there was a groundbreaking for phase two of the Columbarium (picture shown).
On October 10, a crew began working on the groundwork and footings for the second columbarium structure.
On October 6, there was a groundbreaking for phase two of the Columbarium (picture shown).
On October 10, a crew began working on the groundwork and footings for the second columbarium structure.
Affiliated with the ELCA and Saint Paul Area Synod